aeroport de luxembourg

Upgrade of Air Traffic Control Systems at Luxembourg Airport from 8 June 2019

  • A major upgrade of Air Traffic Control Systems at LUX
  • Timeframe from 8 June 2019 – 17:00 UTC until 7 July 2019 – 22:00 UTC
  • Flight delays expected, cancellations possible

The Administration de la navigation aérienne (ANA) announces a necessary upgrade of the Air Traffic Control Systems (ATC) and software from 8 June 2019 until 7 July 2019. During this period, the airport has limited capacity and expects delays in departures and arrivals. Furthermore, flight cancellations may be possible. Operations will definitely be impacted on Sunday 9 June 2019 by the ATC-upgrade, time delays are expected. We recommend passengers check their flight status with their airline and adapt their travel plans accordingly. Moreover, we advise passengers to arrive at the airport on time if their specific airline has not announced any flight cancellations.

We kindly ask for your understanding and apologize for any inconvenience caused.

For more information about the upgrade, especially for background information and technical details, check: https://bit.ly/2wD54kJ

loader left wing loader right wing